CodexAI
AND
OR
NOT
"…"
DÉCISION / ECLI
TYPE
DATE
EXTRAIT
CASELAW;JUDGMENTS;CHAMBER;ENG
ECLI:CE:ECHR:1994:1124JUD001528789
24 novembre 1994
The first paragraph of Article 1 of the Protocol provided: "The Moroccan Government shall pay the French Government compensation in a single lump sum and the French Government shall be responsible for
Page 32 sur 79
ECLI:CE:ECHR:2012:0726JUD003877305
26 juillet 2012
He further concluded that the applicant had sustained the following injuries: compressive fractures of the body of the eleventh thoracic vertebra and the body of the third lumbar vertebra (компресійний
ECLI:CE:ECHR:2008:0722JUD001030103
22 juillet 2008
On 22 March 1999 at 3.15 p.m., the applicant was examined by the prison doctor, who observed two brown coloured bruises on the right scapula and a scabbed abrasion on the lumbar region.
ECLI:CE:ECHR:2010:0722JUD001898402
22 juillet 2010
cover to the first applicant, the first applicant had had to subscribe to an individual health insurance for himself which had cost him in contributions EUR 11,375.12 from 1993 until May 2008 plus a lump
ECLI:CE:ECHR:2017:1212JUD004504406
12 décembre 2017
In particular, they had punched him repeatedly in the face and the lumbar region and had tried to knock him down. 9. They then took him to the Pskov regional addiction-treatment clinic.
CASELAW;DECISIONS;ADMISSIBILITYCOM;ENG
ECLI:CE:ECHR:2016:1206DEC001033713
6 décembre 2016
conducted or supervised by a prosecutor and in judicial proceedings without undue delay ( ustawa o skardze na naruszenie prawa strony do rozpoznania sprawy w postępowaniu przygotowawczym prowadzonym lub
CASELAW;COMMUNICATEDCASES;ENG
ECLI:CEDH:001-209089
9 mars 2021
Chambre 4 SB
63c10591bf9fd47c90a137a8
12 janvier 2023
D'ALSACE [Adresse 5] [Localité 2] Comparante en la personne de Mme [F] [E], munie d'un pouvoir INTIME : Monsieur [D] [M] [Adresse 1] [Localité 3] Représenté par Me Vaska MITEVSKI DE LA LUBIE
ECLI:CE:ECHR:2017:0411JUD003254608
11 avril 2017
and blue haematoma measuring 2 cm by 3 cm on the right shin; (iv) hyperaemia measuring 1 cm by 1 cm on both buttocks; and (v) hyperaemia measuring 2.5 by 4 cm on the right side of the lumbar
3e chambre - formation à 3
DCA_21DA02609_20231003
3 octobre 2023
société Beterem Ingénierie, aux droits de laquelle est ensuite venue la société TPF Ingénierie, une mission de maîtrise d'œuvre relative à la construction du centre d'entretien et d'intervention (CEI) de Lumes
ECLI:CE:ECHR:2019:0326DEC005165110
26 mars 2019
a medical certificate of 16 February 2010, at the hospital the applicant was diagnosed with concussion, injuries to the right side of his forearm, fractures of both heel bones and an injury to his lumbar
ECLI:CE:ECHR:1981:1127JUD000630173
27 novembre 1981
Winterwerp medical treatment whenever this might be necessary; 2) the State shall transfer a lump sum of Fl. 10,000 (ten thousand guilders) to [Mr.
CASELAW;DECISIONS;ADMISSIBILITY;ENG
ECLI:CE:ECHR:2009:0623DEC002644606
23 juin 2009
The judgment debt consisted of payments in the form of a lump sum and monthly allowances, the latter obligation arising with effect from 15 February 1998.
CASELAW;REPORTS;FRA;FRE
ECLI:CE:ECHR:1997:0409REP002435294
9 avril 1997
The present case concerns a claim for reimbursement of 594 French Francs, a lump sum due for expenses incurred while the applicant was placed voluntarily in a psychiatric hospital and, more
PRESS;CHAMBERJUDGMENTS;ENG
ECLI:CEDH:003-1939053-2041466
1 mars 2007
A medical examination carried out on 13 October recorded bruising on Mr Belevitskiy’s left hand-side between his fourth and sixth ribs and around the lumbar region as well as a scratch on the left
ECLI:CEDH:003-68386-68854
27 février 2001
The applicant was also awarded a lump sum of ITL 3,000,000 for the costs he had incurred before the Court.
CASELAW;JUDGMENTS;COMMITTEE;ENG
ECLI:CE:ECHR:2020:0903JUD005975309
3 septembre 2020
The applicant also claimed a lump sum of EUR 10,000 for the costs and expenses incurred before the domestic courts and before the Court. 21.
ECLI:CE:ECHR:2010:1109DEC002151905
9 novembre 2010
The bailiff was instructed to recover GEL 350 (EUR 159) from the debtor in a lump sum as arrears for the past seven months of non-payment, and to ensure the continuous payment of the maintenance in future
ECLI:CE:ECHR:2025:0527JUD001434717
27 mai 2025
The Court also decided to award each of the applicants who had requested compensation, which included the applicant in application no. 47603/18, a lump sum of 5,000 euros (EUR), covering non-pecuniary
ECLI:CE:ECHR:2025:0527JUD006988417
9452/19, a lump sum of 5,000 euros (EUR), covering non-pecuniary damage and costs and expenses, plus any tax that may be chargeable on that amount. 4.